| February Baby Sweater for a Boy with Huggy Bear Hat to Match |
Monday, December 27, 2010
52 in 52 #41 and #42
Sunday, June 20, 2010
52 in 52 Project #24
Sunday, January 3, 2010
More Baby Sweaters and Etsy
I've listed this for sale on my etsy site. I donate all the proceeds from my baby sweater sales to The First Unitarian Society of Plainfield, NJ.
Wednesday, July 8, 2009
Various
I'm happy to report that I have finished the Weavers Wool Mini Shawl. Here's a photo of it blocking. The points on the chevron edging were curling up. I'm hoping that blocking will cure that. I have to give real credit to Patrice of ravelry whose modification of the original design I shamelessly copied. That's the wonderful thing about ravelry; the opportunity to see what other knitters have done with a particular pattern. Patrice also used Berroco Geode, in a different colorway, combining it with Berroco Ultra Alpaca. I had the Geode in my stash and had some Cascade 220 that complemented it. I'm happy with the color combination. Here's hoping the blocking is successful.
I'm sending off another letter and I discovered four $.18 stamps in the $.15 envelope. They commemorate the Space Shuttle. I'm not sure which year they date to. I've combined two of them with a $.08 stamp to obtain the requisite amount. Click on the photo to get a close-up look at the stamps.
Sunday, January 25, 2009
Progress Report
The yarn arrived on Saturday for the skirty for Linny and I got right to work. It now has a ruffle based on the feather and fan pattern. It required a repeat of 17 stitches so I increased four stitches around the base of the skirt and then launched into two repeats of the pattern. I like the effect. I've finished the I-cord tie string and I'm ready to bind off one leg opening. One more leg opening to make ribbing for and this is a done deal.
Mr. Greenjeans now has a completed button band with one button hole at the top of the cable section of the body. I've tried it on and it's a bit tight but I think with aggressive blocking it will stretch a bit. If I had it to do over again, I wouldn't switch to the smaller needle to do the cables. I would have done the entire sweater on size 8 needles. I'm about to start the cable section of the right sleeve. And, I have to complete the left sleeve but I feel on track to complete these two items by the time my craft group meets on Thursday.