Wednesday, June 9, 2010
52 in 52 Project #21
Saturday, August 1, 2009
Traveling
My mom had trouble hearing a conventional alarm clock, something I’m very familiar with. Once I take my hearing aids out at bedtime, the world is a very quiet place. So, I bought her a clock aptly named “Sonic Boom.” I’m not sure she ever used it and as we were clearing out her apartment last June, I claimed it.
I’m invariably awake every morning by
I am happy to report the clock worked well. The alarm sounded and the light flashed. It woke me up. I don’t know if it also awoke our upstairs neighbor. It was pretty loud if I heard it without my hearing aids.
The flight from
I’m now waiting for the connecting flight to Eureka/Arcata. I had hoped to post live, but the free local wi-fi does not seem to be working and T-Mobile put me through such an ordeal to get a one hour pass that I gave up. Every time I filled out the form, it was rejected for some minor reason. T-Mobile then totally cleared the form expecting me to start over. Even with auto fill, it just wasn’t worth the trouble.
When I wasn’t looking out the window, I was working on knitting projects. I took some progress pictures in the airport. Carlos is so close to being finished:
And, Laughing Carrots is really coming along:
My goal is to finish those two and Oriental Lily before it’s time to fly home.
Thursday, July 23, 2009
Various
It's been a good meeting, at Castleton State College in Castleton, Vermont. It's a pleasant enough campus although there is a lot of construction going on. The most annoying aspect of this is the constant beeping of the back-up alarms on the various pieces of machinery. Work starts at around 7 AM and today, at least, is still going on at 5:10 PM. It's been great to see old friends, particularly the women from Maryland who hiked with me when I was completing Pennsylvania, West Virginia and parts of Virginia. I ran into a man who hiked the Tour du Mont Blanc with us all those many years ago and the sister of a Whiting neighbor who lives in Wisconsin. I only see her at these biennial events.
I had registered for a different trail segmant every day except Monday. Saturday, on a hike designated moderate, with a steep uphill climb at the outset, I developed symptoms of heat stroke about a mile in. There was a doctor in the group who stayed with me, helping to cool me down, while the group continued on without us. Ultimately we returned to our cars and drove back to the campus. That was a disappointment. The next day, on another section with a similar elevation gain, the leader went more slowly and I was able to complete the hike. The weather was a bit cooler and less humid, but I wasn't moving along as quickly as I did last year. I think it's a result of my not keeping up with an exercise regimen.
Monday was the biennial meeting. Afterward I went biking on the Delaware and Hudson rail trail with a group. We biked down to Poultney, had some ice cream and biked back.
There has been quite a bit of rain in Vermont this summer and the trails are very muddy. I decided not to hike again because of my lack of stamina (didn't want to be holding other hikers up) and because I was tired of the mud. I've been taking a power walk each day on the rail trail and then spending time knitting and listening to books on my Ipod. I finished The White Tiger by Avarind Adiga and Made in the USA by Billie Letts.
I've got about ten inches done on the body of the Laughing Carrots sweater and I'm about ready to do the waffle trim before I start the carrot pattern and I was drawn back to the pink charity sweater for some reason. I've finished the cuff on one sleeve, almost completed the garter stitch edging on the body and am also working on the second sleeve (both at the same time--don't ask--it's knitting ADD). I don't have too much to finish on the Carlos growling dog sweater and the sleeves need finishing on the Oriental Lily dress. Carlos and Oriental Lily need to be finished before I go to Cali on July 31. I just can't seem to focus on one project at a time but I do ultimately get everything done.
No photos to post because of the missing cord. I'll get some up when I get home.
Tomorrow I'm meeting my sister, brother-in-law and nephew to hike a section of the AT over near Woodstock. Going south to north, which is my preferred direction, it's only 400 feet of elevation gain. Since I did 1500 on Sunday, albeit near the back of the pack, I should be able to manage. I'm really looking forward to seeing them.
Then it's time to head home.
Tuesday, July 14, 2009
Moving Along
The Opal Lily dress has one sleeve nearly finished.
Carlos, aka, Growling Dog, has one sleeve and the neck finished. I had a hard time picking up the same number of stitches for the second sleeve, but I think it will be okay. I hope to finish this one tonight at Knit Group. It's made of Berroco Comfort DK and I'm not very happy with this yarn. It's soft but it's very splitty. I really think this sweater would be much nicer if the pattern were rewritten for worsted weight yarn.
And, this is Decimal--doesn't look like much, does it? I frogged it today. I really didn't like the way it was shaping up. The original pattern called for a DK weight yarn and I thought I could make it with a worsted weight because I'm such a tight knitter. It just didn't look right and I haven't done any work on it since we got back from Florida. That in itself is a sign that it's a project that is just not meant to be. I'll have to find something new for the yarn.
Wednesday, March 25, 2009
Digression
In November, at Stitches East, I bought two large balls of Kauni EM (scarlet, crimson and red-violet) thinking they would make a nice sweater for DH. I knew I would need to combine a second color but I didn't want to do the standard rainbow effect--couldn't see how that would work in a man's sweater. On my first visit to the Lion Brand Studio in NYC I saw just the thing. A large cone of charcoal gray, very fine wool. I grabbed it.
I'm doing my own modification of both the Kauni design pattern and the sweater pattern. The classic Kauni rainbow pattern has stripes and small squares. The color changes in Kauni are very long making it possible to use two skeins, started at opposite ends of the rainbow, and achieve a moving color pattern. I'm using one mostly red skein juxtaposed against the solid charcoal.
The original pattern is done in the round, all in one piece (a very large tube) and then, horrors!, cut or steeked to make openings for the sleeves and the button front. I'm just not ready to cut my knitting so I've widened the stripes and plan to approach this as a standard man's sweater with dropped sleeves. I'll knit in a tube until I get to the arm holes, divide the front and back and knit them separately until I get to the neck. I'll join the shoulders, pick up stitches and knit the sleeves.
Here's a photo of my progress so far:
In the next section, the squares will be red and the background will be gray. This pattern will alternate up the sweater--red with gray squares followed by gray with red squares. I think it's going to be quite handsome.
Saturday, March 14, 2009
Decimal Progress
Thursday, March 12, 2009
Spring Knitty
The sleeves are very flared. Rather than knit a swatch (a swatch! when do I ever bite the bullet and knit a swatch?) I decided to cast on for one sleeve and see how wide it was with the gussets that make it flare. It was much too wide! The pattern itself, though is easy to follow and it really is attractive knit up. I frogged the sleeve and cast on again for only enough stitches to create it without the gussets. I'm almost to the place where I was when I decided to frog. This is going to be fun, just enough challenge with the lace pattern to keep my interest.
Friday, February 20, 2009
I'm Tickled Pink about Mr. Greenjeans who Happens to be Mostly Blue
The First 100 Days KAL has provided motivation and encouragement. Two promised UFO's are now finished and there are two to go.
Sunday, October 7, 2007
Finishing Sonnet

Wednesday, September 12, 2007
Getting Excited
We've done this kind of trip before using an outfitter that booked the hotels and ferried the luggage. This time we will be carrying everything we need on our backs. I've carefully selected things for my pack and it weighs about 17 pounds. I think we will manage fine.
It's a strange time for me. My last day of work is October 12 so I will work two more weeks after we return home. There are a lot of loose ends to tie up. The powers that be at the agency are already campaigning for me to stay on in some capacity doing home studies or staff training or both. I will be negotiating with them when I come back. I'm so ambivalent. I want some time off to play but doing a bit of contract work would sure help pay for my health insurance. I have to COBRA for ten months and it is really expensive!!
I'm hard at work on Sonnet. I've finished the second arm hole and am nearing the finish of the front shoulder. It's almost time to decrease for the neck. I don't think I will finish before we leave (I have to do the sleeves) and I won't be bringing it to France because everything I bring I have to carry. I'm going to bring the sock project instead because it's small.



